Jim worked in the control room this morning.  More things are coming to life - he worked on bringing the water softener into the system.  We had bought salt and he loaded up the tank.  He still has to do some setting adjustments but right now all of our water is going through the softener!


The new union came in so Jim spent time getting that all in place and then connecting everything back up.  He ran another pressure test with air and all seems good in this section.  He also started working on the connection to the acid neutralizer - he needs to get a few pieces but he's working out the design now.


In the afternoon, he switched to working electric.  He wired up the second pendant light and then went back to the first one and finished it.


Let there be light!  All working now - and they look awesome!  Jim tied the ribbons on so we don't bump into them right now.


 
 Then he wired up the light above the kitchen sink.  He just has one light in right now - this fixture will have to come down when we paint.
 


Now that the ceiling is done, Jim can mount the fan in the kitchen!  Starting to wire everything up...


All done and looks great!


 It's still drying but the master bedroom ceiling looks amazing!

 