Sunday, September 14, 2014

9.14.2014

Time for some redoing to start the work day...since Jim switched over from white wood to treated wood for the doorframes, he had to redo the top of the man door that he didn't do before.


Once that was done, it was time to keep building.


Again, these are really tough areas to do - corners, switching different sized foam pieces...it all takes quite awhile to figure out.


Then Jim got out the laser level to take some measurements around the perimeter just to make sure all is well.


Time for more scaffolding too.  The scaffolding is up in the shed so the Bobcat helps but Jim has to get it all out and down into the site.


But wow - look out amazing it looks!  It really changes the way it looks when there is foam surrounding the doorway!  And notice that Jim got the header over the garage door too (better picture of that tomorrow!).

No comments:

Post a Comment