Jim did more wood prep this morning...
Then started the gluing process for the third shelf for the bathroom cabinet...
Then he started investigating how he was going to drill holes in the bottom of the wall cavity to run the air conditioner plumbing lines. He had to don his mask and gloves because - ugh, insulation.
He made a piece of blocking and drilled a hole in it to use as a guide when drilling the pilot hole through the track and flooring...
You can see that he had zero room to work - his drill barely fit in the cavity...
He put a tiny piece of wire through the pilot hole so that he could find it down below in the wood shop ceiling...
Then he was able to use his hole saw to drill the hole from the bottom...
No comments:
Post a Comment