Thursday, February 4, 2021

2.4.2021

This morning, Jim dug through his supply of rough cherry wood.  He bought this wood before we even built the house in Ohio!  He'll use it to make the drawer sides.


These are going to be deep drawers so they will require bigger sides.  He planed the wood and then glued them - there's even one in the background glueing!  


I had a haircut and then did pickups at Lowe's, Target and the grocery store.  Meanwhile, Jim was busy continuing the wiring in the metal shop.  He had to take apart all the switch boxes and run power to the new switch that will operate all three of the new metal shop lights.  


Next he had to use fish tape to get the power from the switch box up inside the wall and over to the light by the door...


Wire all pulled where it needs to be and switch boxes all put back together...


Then it was wiring the light inside the door again...


And wiring up the last of the three new lights...


Reflector on and all three lights are now operational!  It's a great light too over Jim's steel table - no shadows anywhere and it lights up this whole area.


High 38/Low 16


No comments:

Post a Comment