Jim assembled the door fronts this morning for the sink base cabinet...
Both in the drying stage...
He trimmed the Formica from the new shelf for my dish cabinet...
This striped wood is so pretty on the underside...
Putting together more wood for the refuse cabinet drawer assembly...
Since we got paint yesterday, Jim was able to paint the fronts of the drawers...
All painted and drying...
Jim had to get a new welding helmet - his other one took forever before it would come on and darken. He said this new one works perfectly and is so clear. He was doing some welding on pieces for his welder cart.
It snowed all day - it looks like we have about 6" of new snow today. We were looking out the back window this evening and the accumulated snow on the ground just looks so pristine. There's probably at least 3 feet of snow in the back of the house.
|
High 31/Low 30 - all day snow! |
No comments:
Post a Comment