This morning, Jim worked on preparing wood to make the drawer fronts for the new cabinet...
We are going to have 3 drawers in this cabinet. Jim is getting pieces glued to make two fronts...
The other drawer front in the glue stage...
After lunch, Jim headed out to clear the driveway. We got about 6" total although we're still having some very light flurries right now. Jim was just happy that the snowblower worked great after he had issues getting the hydraulic lines connected the other day...
Then it was back to wiring up this light in the metal shop...
Jim got both of the lights in this bay all buttoned up and reflectors on!
|
High 30/Low 21 |
No comments:
Post a Comment