Monday, February 15, 2021

2.15.2021

 Jim put the hardware on the refuse cabinet front panel this morning...


Then attached it to the glide hardware...


Look how perfect it is!


Next, Jim did some adjustments to the dishwasher, leveling it and getting it to the right height.  


This front wall is definitely taking shape!


Back down in the drawer factory, Jim cut the Formica that he will attach to the drawer bottoms...


Then he started prepping wood for the paper towel holder and drawer that will go at the top of the refuse cabinet (very exciting!)...


The gluing station...


Another coat of polyurethane on the drawer bottoms...


Then polyurethane on the side/back drawer assemblies...


First coat done and drying...


High 25/Low 21 - snow is on the way!


No comments:

Post a Comment