Friday, July 31, 2020

7.31.2020

Jim was back at plastering this morning.  He's basically starting from his original beginning point each day and doing additional coats and touch ups before continuing down the wall...


After lunch, he took the door and drawer out of the cabinet that needs to be removed for the beverage cooler to go in its spot.  Then he just did some investigating on how he installed it so he knows the next steps...


Then it was back into the auto bay to continue drywall.  This was another challenging piece.  He first had to take the hose reel and mountings off the wall...


Then cutting the piece...


He had to use his hole saw to make a hole cutout for the wiring conduit to fit through...


 He threaded the wires through the hole...


It was a perfect fit so he's putting all the screws in.


At this point, he had to make a trip to the drywall supply company before they closed for the day to get channel that he needs to go at the top of this wall section before he can continue on with drywall installation.

High 82/Low 59

No comments:

Post a Comment