After lunch, he took the door and drawer out of the cabinet that needs to be removed for the beverage cooler to go in its spot. Then he just did some investigating on how he installed it so he knows the next steps...
Then it was back into the auto bay to continue drywall. This was another challenging piece. He first had to take the hose reel and mountings off the wall...
Then cutting the piece...
He had to use his hole saw to make a hole cutout for the wiring conduit to fit through...
It was a perfect fit so he's putting all the screws in.
At this point, he had to make a trip to the drywall supply company before they closed for the day to get channel that he needs to go at the top of this wall section before he can continue on with drywall installation.