Monday, July 20, 2020

7.20.2020

Jim spent most of the day plastering - doing second coats on the angled corners...


Taped seams...


And around doorways...


Then it was outside to do some rock wall work.  Using the spud bar to move a rock into place...


We filled in the holes and crevices of the bottom layer with small rocks to provide more stability...


Then it was back to collect more rocks...


Dropping them off...


Back for another load and dropping it off...


Doing a little hand work before calling it a day on the wall work and moving inside to get some cardio on the treadmill (Jim's my hero!).


High 86/Low 59

No comments:

Post a Comment