Thursday, July 23, 2020

7.23.2020

Jim got an early phone call this morning that the drywall was on its way so he headed down into the shop to get some blocking pieces up to keep the drywall off the floor...


Since they are still behind schedule, they didn't have a boom truck available so brought the drywall on a flat bed...


The guys carrying the drywall in...  One of these guys was brand new to the job so it was a learning experience for him.  People who've never done it before don't realize how very heavy drywall is!


Jim had them put the 1/2" drywall against the wall first and then the 5/8" because he'll use the 5/8" in the auto bay first.


All in place...


After Jim was able to sit down and eat breakfast, he worked in the stairwell on plastering again.  It was a humid day today plus working with plaster puts moisture in the air.  Add to that working in these close quarters!  But Jim never complains.


Jim then got ready to switch the tires on my car.  He marked the winter tires with their current location so that when he puts them back on the car, he can rotate them...


Jim is thrilled to have such a wonderful area to work in - lots of room, good lighting, and a great floor!  It's only going to continue to get better too.


Jim finished off the day cutting grass.
High 81/Low 61 

No comments:

Post a Comment