Thursday, July 2, 2020

7.2.2020

Jim cut the side pieces today for the next cabinet shelf and then did the millwork...


Then got it in the gluing stage...


A coat of polyurethane on these shelves...



This is the part that I picked up at Lowe's yesterday for Jim - it's an adjustable bracket for his bull float that allows him better control when doing concrete.  He had to go into the metal shop and cut a couple of the attachment screws.  How nice is it to have everything accessible like that to do these projects?


Then he worked in the pole barn on the electric power project.  He had to go up into the attic and find his metal conduit and then find all the tools he needs for this job - been awhile!  He mounted two boxes - one switch box that will turn on lights in the main area and the attic.  Then the box at the top for the wires to make the turn into the conduit.


First wiring run - from light box over to the front wall, into the box and down the conduit into the light switch.


High 88/Low 65 

No comments:

Post a Comment