Tuesday, March 3, 2020

3.3.2020

In the workshop this morning, Jim was making sure the panel fit the way he wanted in the side cabinet piece with the rails in place...


Then he glued the rails in place...  You can also see a shelf being glued up as well.


And another shelf in progress...


Then he started on the door frame pieces - here he's marking where he needs to cut.


Starting to fit the top molding...

 
Attaching the molding...


 Measuring for the top piece on the second bedroom door...


Fitting the piece...


Attaching...


Molding all finished!


Finished as well on the inside of the door as well as around the closet opening...


Jim had some pieces left over - he cut them down a bit and tried it out around our attic door...


The molding looked good so Jim proceeded to cut and fit the pieces - kind of a tight space to work.


But it looks fabulous!  All the door moldings are finished now - the attic door moldings will be painted the same color as the room; all the rest of them will be painted Shaded Ice.


High 56/Low 34


No comments:

Post a Comment