Wednesday, March 25, 2020

3.25.2020

Jim trimmed the Formica on the drawer bottom this morning...


Then assembled the drawer...


Look how pretty the side view is too!


With the drawer assembled, Jim was able to start working on the placement of the drawer glide...


 Then it was time to start assembling!


More shelves in place...


Drawer glides fastened in place...


Jim spent a lot of time tweaking every piece of this shelf until it was perfectly square - but it's all worth it!


Ta da!  All assembled and looks beautiful!  Jim didn't want to paint the outer edges yet because he had to do so much clamping that it would definitely mar the finished surface.  He is still contemplating how he wants to approach that task.  But I'm getting very excited to think about this being in the kitchen before too long!


High 43/Low 26

No comments:

Post a Comment