Sunday, March 22, 2020

3.22.2020

This morning, Jim worked on completing the conduit to reach his planer...
 

 Last section going in place...


Then the connection hose...


Jim got the conduit all strapped to the trusses with wire ties and everything buttoned up!  He made provisions for another section to go over to the drum sander at some point as well.


Then it was sanding time on the side panels...


A coat of primer on the back side of the doors...


He lightly sanded and then put the final coat of polyurethane on the shelves and drawer assembly...


 Drying...


High 36/Low 21

No comments:

Post a Comment