More electric progress this morning...Jim got the conduit placed in the holes on the outside of the frame.  He then ran wire across and down to a box on the other side.
 

He continued wiring up boxes and getting receptacles installed and working.


We had thought it was going to be a little warmer than it turned out to be - especially with a pretty brisk wind again.  But after lunch, Jim went back up and got all the screws finished on the first course of the sheathing.


We cut the next piece of sheathing and Jim carried it out and onto the landing.


I helped steady the sheathing from the inside while Jim pulled it to the outside and then got it into place...


Getting everything aligned and into place...


Everything was a good fit so it was on to attaching!  Things went a little better on this side of the hip rafter - by the time Jim stopped to come home and get ready for church, he had gotten the whole piece fastened down.

 