4.21.2015

It rained some overnight too but dried out around lunchtime, so Jim headed out to the land.  Unfortunately, the rain that we got caused some of the sand that was around the sewer pipe in the trench to wash away.  So he built kind of a dam with more sand and then gravel on top to prevent any more run off.  Then he had to get the laser level out and get everything set again and put more sand in to hold everything in place.


Gluing up the last connection from the tank to the distribution box.


All the lines are complete!


The last thing to do was to glue down the T-baffle on the inside...it's now all complete and ready for inspection tomorrow!

 
Jim decided to go up and see if he could get the pump working for the water.  Remember that this has been outside, exposed to the brutal cold we had this winter.  Jim had it covered up, but still, it sat out in all the cold and snow.  He got it hooked up again and...water!
 