Then Jim went back to work with the excavator - this time doing the side where the stairwell will be.
This area still just needs a few inches off so Jim ends up doing more crumbing than normal.
A little clean up of the dirt thrown in the middle was required in order to have room for the excavator to dig the top of this side wall.
You can see on the left-hand side of this picture that this area was stepped down 18" again. The footprint really looks good! It's basically done for the area that Jim wants to do for the first pour. Which means that after a little crumbing and cleaning up in areas tomorrow, we'll be able to start building concrete forms!