He wanted to get 250 bricks - but they only ended up having 241 so hopefully that will do it. They lifted them in the truck in a pile, but then Jim had to lay them out in the back of the truck so they wouldn't topple and break.
Tag from the brick |
Jim unloaded all the brick and got them ready around the pedestal. It was really warm today so this was a lot of work!
Tomorrow is the perc test and septic design meeting with George. So Jim also had to get everything ready for that. He had to get the equipment over there and get water ready and available at the site.