Saturday, February 9, 2019

2.9.2019

Jim continued to do some work on the molder - taking things apart and cleaning it all up while he waits for his parts to come in.


 The rest of his time was spent in the metal shop working on the wiring.  He got all the receptacle boxes pigtailed, brought power to the 120V line, and got receptacles wired up.  Basically all he needs to do is bring power from the breaker box to the 240V line.  He ran out of wire, so we left early for church and stopped into Home Depot for the wire and a couple of receptacles.

High 26/Low 9

No comments:

Post a Comment