Saturday, February 16, 2019

2.16.2019

The driveway is very icy right now.  I had to get a 3,000 piece mailing to the post office before they closed at noon so Jim loaded everything in my car and took me.  Going down was very slippery in spots and we didn't think we would be able to get back up.  But we did - yay!  He later went down and spread more gravel out - which is a treacherous job walking over the ice with shovelfuls of gravel!

After lunch, Jim worked on getting the wire to where he wants the switch to be for this bank of lights.    The conduit is already tight with all the wires coming down in this area that Jim wasn't sure he would be able to get any more in.  But he got the fish tape to go through so here he's attaching the two new wires...


and pulling them through...


So now the wire is fed through all the conduit.  Jim will next have to cut through the foam to put a switch box in but the challenging part is accomplished!

We are leaving early for church and heading into Lowe's to pick up some more polyurethane first.

High 32/Low 9

No comments:

Post a Comment