 Jim was back plastering today, continuing to work on the ceiling of the auto bay...


Mid-afternoon, he switched to do some work outside getting ready for the next concrete pour.  Here he's figuring out elevations with the laser level...


Then working on the forms to get the curve that he wants...


Using the Bobcat to scoop up some gravel in front of the pole barn to get that area ready...


We struck a reference line on the outside of the pole barn floor and then Jim was working on starting to do some grading (which always involves hand shoveling!)...


High 69/Low 47 - beautiful!