Saturday, August 29, 2020

8.29.2020

Jim worked this morning on installing drywall around this pilaster in the auto bay.  Another tricky piece to cut going around the beam plus he stuffed installation behind the drywall next to the beam as well.


Fitting the next piece...


Drywall done and corner bead attached!


Jim decided to wire all the receptacles back up in this area so they can now be turned on with the switch rather than the temporary bypass he had set up while he installed drywall in this area.


Then it was plastering on the ceiling of the auto bay...


He worked on plastering the upper part of the tapered joint today; he'll do the lower one tomorrow to insure a good seam.  Then it was working on the hip seams...


Church time!
High 73/Low 56 - on/off light rain


No comments: