Saturday, November 9, 2019

11.9.2019

Jim put a coat of polyurethane on the window frame moldings today...


As well as on the jamb extension for the dormer window...


One of the drying stations...


Then he continued to prep the metal shop floor for caulking the cracks - here he is putting the backer rod in the crack...


 Off to church!
High 34/Low 23

No comments:

Post a Comment