Jim worked on running wire today from the breaker box into the second bedroom.  This is a long run and takes a very complicated path.  As you look down the hallway, you can see wire going above the door frame, then up the wall, before it gets into the room.


Because there were so many corners that Jim had to get through, he came up with another jig that he used to drill an offset hole...


Finished hole...


This allowed the grommet to be placed...


Jim has that circuit pretty much finished now - we just have to decide on lighting in the closet.

Then he worked on wiring up the ceiling fan box in the living room - again this required drilling lots of holes (and above his head too).

 
At the end of the day, Jim went to Lowe's to pick up more lumber to finish door/wall framing as well as electric components.
 