Friday, February 17, 2017

2.17.2017

Jim was back to doing electric work today.  When I got there with lunch, he had gotten more circuits in and was wiring up a receptacle.


But by the end of the day, he got a total of 8 circuits through the conduit and into the apartment, including the two heavy-gauge wires!  The last two were really difficult - the last one took almost an hour to get it through!  There is only one more circuit for the kitchen - for the lights.  He's going to run that one through the living room and across the hallway.  Plus, Jim got more boxes wired in the kitchen too.


At the end of the day, he switched gears a little bit and did some more drywall nailers going up the valley rafters.

 
High 33/Low 10
 

No comments:

Post a Comment