Jim had to start his day with a visit to the eye doctor for his routine checkup.  Thankfully, his eye pressure was good and all the tests came out fine.  So grateful for all the good news!

Today was the day to install the last piece of Corian countertop on this section of counters!  First, Jim brought up a scrap piece of Corian just to see how much he needed to adjust the stove height.


Adjusting the stove's feet...


Then bringing up the Corian...


Being careful not to hit all the obstacles in the way!


Setting it in place...


So beautiful!


Jim had purposely left the first section of countertop a bit too long in case he needed some wiggle room.  So we carried it back down to the shop where he trimmed it just a tad...


Then we brought it back up and put it in place...


How gorgeous is this?  I absolutely love it!


Jim had to spend a good chunk of time cleaning up the shop after the Corian work.  There were plastic shavings all over the shop and attached to everything in it!  He had to use the vacuum to get most of it.

Then it was time to think about the next cabinet!  He started glueing up some wood...


Sanding up more window molding...


Doing some staining...