Jim had some computer work and phone calls to make this morning, including ordering new lift cylinders for the Bobcat! We've been talking about replacing his for a long time, so he finally went ahead and ordered. Then he got his tools and equipment ready and out to the shed area mid-morning. Putting up the end stud on the back wall...
Fastening it in place...
Then put in the special metal to wood pan head screws...
Putting the top and bottom tracks pieces together so we could mark stud location...
He designed it so that the now flat area will slide underneath the end track to tie both sides together...
We had a little rain delay - a brief shower came through and we had to grab all the tools and take them undercover in the pavilion. But once it stopped, we were back out. Here Jim is measuring to make sure everything is level...
Jim did the pre-drilling and attached the wall through the bottom plates...