Saturday, April 6, 2024

4.6.2024

 Millwork done for fitting side and bottom panels for testing...


Jim has to do hand routing of the top dado because it can't go all the way to the front of the cabinet...


Millwork all done on these pieces...


Doing some planing...


These are all drawer pieces ready to be sanded down to the perfect thickness....


To save a little money, Jim has been buying rolls of sandpaper in different grits to make his own belts from the drum sander...


Sanding...


High 43.9/Low 32.4


No comments:

Post a Comment