Monday, March 14, 2022

3.14.2022

 Jim got the first shelf out of its clamps and sanded...


The second one is in the gluing process...


It was time for Jim to put a new sandpaper roll on his drum sander.  In the past, he has bought pre-cut strips that are ready to go, but this time he bought a roll of sandpaper to make it himself.  Taking the old one off...


Laying out the new roll alongside the old...


Making the top angle cut to match...


New roll replaced - at about half the cost!


Staining the other side of the panels for the desk...


A coat of polyurethane on the first moveable shelf...


The first coat of polyurethane on the desk top as well...


At the end of the day, Jim did a little caulking on the shower moulding...


High 48.7/Low 23.1


No comments:

Post a Comment