Jim started his day with a bunch of trips up and down the stairs moving all the tubs and boxes of dishes that I went through yesterday to the metal shop to be arranged on the steel shelves.

After that, he did the skim coating of the front wall this morning...


And cleaned up all the edges around doors...


Then it was back to work on wiring in the metal shop - he was able to get the other circuit pushed through to the box...


Then he started wiring up inside the box.  He has to be very careful because the main power to the box is live.


Five circuits wired into the box (and so neatly!). One circuit is into the box but not wired in yet - that's the front wall.


Then he was able to get the lights circuit through the conduit - just needs to get over to the box now...


You can see how packed the conduit is, plus Jim has to go through all the curved pieces...


High 37/Low 18 - some snowflakes around