Sunday, January 19, 2020

1.19.2020

Jim took all the clamps off the Corian this morning and cleaned up the inner glue joints...


Then he sanded the tops of this edging in preparation for the next layer...


Next, he had to cut pieces for the next layer...


After lunch, Jim had to head outside to plow snow.  We ended up getting about 6" so it took him awhile to get it all plowed.

He had just a little bit of time before he had to stop and get ready for church, so he started coming up with a procedure for attaching the back glide bracket.  Obviously, these are tricky because they have to be attached at the exact right point opposite the front bracket so they will work properly.  Jim made some temporary blocking to hold everything in the right position...


First one in place!


High 28/Low 5 - 6" of snow

No comments:

Post a Comment