Monday, March 25, 2019

3.25.2019

Jim was back at work in the metal shop on the work bench, now concentrating on the long side frames.  Drilling the holes room the attachment angles that will attach to the legs of the bench...


Holes drilled...


Gotta love a man who cleans up!  All the grinding makes a lot of metal dust - combined with bucketsful of metal shavings from the drilling process.


Putting the side pieces together...


Making sure everything is square before welding...


Beautiful welds!


First side frame is all welded!


Then a repeat of all that to make the other side.  This frame is all welded together and Jim is starting to lay out the truss members that will go inside the frame.


High 40/Low 14

No comments:

Post a Comment