Sunday, May 25, 2025

5.25.2025

 Still had to fight a few raindrops and clouds today, but Jim pressed on and got lots done.  He started out doing some measurements so that he can begin adjusting placement as he gets closer to the top...


Working up...


Looking good...


Distressing the side pieces...


Last full shingle row in place!


The back of the 4Runner is a good place for the shear - we cut the top row to the right size...


Installing top row...


Last shingle...


Jim sat on the ridge to cut the drip edge and make it so that it will mate with the other side...


Using his crimper...


Starting to cut off the excess underlayment from the top...


Once he did the same on the back side, it was time to start taking down the roof jacks!


Taking off the jacks....


Last one...


Roofing is all done on this side and looks fabulous!



High 61.4/Low 47.2

































No comments:

Post a Comment