Monday, May 19, 2025

5.19.2025

Jim cut the first side piece for the overhang and started putting it into place...


 However, it was really hard to get in a good position to be able to apply the necessary force to go through the wood and steel.  He tried from the ladder...


On the side of the scaffolding, and eventually was able to get it attached hanging on the front...


The other side was even more impossible, so Jim cut a plank and stood on it to attach this side piece...


Next, it was cutting the underlayment and starting to attach...


Working on the other side...


All done and protected...


Jim next cut the excess off the fascia board...


Other side...


Before he came in, he did some prep work for attaching the drip edge.


High 54.5/Low 47.1 - cooler and breezy