Saturday, February 19, 2022

2.19.2022

 Jim continued working on the corner shelf today - sanding the shelf pieces...


Jim made the rough pieces for the two cabinet doors...


Door pieces all sized and thinned to the right dimensions...


More sanding of the front frame...


One of the back pieces lightly sanded...


Then it was painting time.  First, primer on all the pieces that will be gray...


Primed and drying...


Then lots of polyurethane on shelves and back pieces...


We got a few inches of snow today, along with high wind gusts, which of course cause drifting snow. At the end of the day, Jim walked down to the mailbox to scope out the driveway condition; he will have to snowplow tomorrow.

High 24/Low 5 - 3" of snow; windy!


No comments:

Post a Comment