Wednesday, February 16, 2022

2.16.2022

 Jim got everything ready to put the Formica on the two cabinet shelves...


Rolling on the contact cement...


After he put the Formica on and rolled it, he clamped the shelves together to dry...


Doing some sanding...


Jim had to confirm where the blocking is behind the walls...


With the new 1/2" plywood he bought at Lowe's last night, he got ready to cut the top piece for the cabinet as well as the backs...


Lots of measuring before cutting - getting ready to cut the top piece...


Top piece cut and a coat of polyurethane on...


High 37/Low 32


No comments:

Post a Comment