Tuesday, September 14, 2021

9.14.2021

 Jim glued up more wood for the side shelf units...


Another section glued...


He primed the cap moulding he had made...


Then he got started on prepping for our storage room in the wood shop, laying out track...


He had to figure out where the Pex is underneath the floor to ensure he doesn't puncture any of the tubing with screws.  Once he figured that out, we marked initial lines on the floor with chalk.  Then he got his laser level out and was able to get precise corners as well as project lines up to the ceiling...


He got his metal saw out and cut track pieces...


Drilling into the concrete...


Putting the tap-con in...


Putting the initial holes in the track with his punch...


Jim temporarily fastened a piece of track on the ceiling where he had marked placement to see if it was in the correct spot...


Putting a stud in place...


Perfectly level so everything is in the correct spot...


He then took the temporary piece down and cut and installed the track pieces on the ceiling.  Next he put up the 3 studs to make this first wall section and corner!


High 68/Low 63


No comments:

Post a Comment