Jim continued preparing wood for moulding this morning...
Gluing...
He then switched to installing the plywood backing pieces in the master bedroom, doing the small areas around the closet...
Using the stud finder on the next wall area...
Installing...
Then it was time for some decorating - we've had some pictures sitting around that it was time to hang them...
A couple more...
This area looks even nicer now!
Then Jim went back down to the metal shop and continued plastering. This whole wall area is just about ready for skim coating!
Working on the area near the door...
Looks like we are forecast to be in the path of Hurricane Fred tomorrow - hopefully we won't get a deluge of rain that will wash away our new dirt on the triangle!
|
High 77/Low 66 |
No comments:
Post a Comment