 More working in the moulding factory - Jim said I could just use pictures from every other morning - ha! 


More gluing...


Jim mostly wore his electrician hat for the rest of the day.  He had wired the Tig welder into a 240V circuit so that Kyle could use it when he was up.  But Jim wants to use that circuit strictly for the air compressor and car lift so he rewired into the other 240V circuit on the back wall.


He wired a plug onto the connection to the car lift - this is temporary until he decides for sure how he wants to wire things.


He got both of the lift cables attached now and the hydraulic cables in place...


Then he worked on the electric in the pole barn - he got the junction box all wired up and the wires brought down to the switch box...