Wednesday, June 4, 2025

6.4.2025

Jim finished up the mailbox repair job this morning and got it installed back on the post...


Our ridge shingles came in the mail so Jim got those unpacked and up on our pallet of shingles...

Jim put the starter piece up on the side of the overhang...


And on the other side.  He has to make the step flashing before proceeding on.

I unwrapped all the J-channel siding pieces while Jim got ready to put the fascia pieces on the sides.  Doing some measuring...

First piece up and fastening it...


Cutting the second piece to size...

Doing the corner bending.  He also marks and punches holes in before installing...


Putting it up in place...


Fastening...


Cutting the first piece for the left side...


Putting it up in place...


Fastening...


Look how perfectly everything mates...


Done...



High 87/Low 54.6




No comments:

Post a Comment