Jim finished up the mailbox repair job this morning and got it installed back on the post...
Our ridge shingles came in the mail so Jim got those unpacked and up on our pallet of shingles...
Jim put the starter piece up on the side of the overhang...
I unwrapped all the J-channel siding pieces while Jim got ready to put the fascia pieces on the sides. Doing some measuring...
First piece up and fastening it...
Doing the corner bending. He also marks and punches holes in before installing...
No comments:
Post a Comment