Jim worked some more on elliptical assembly today - we have handles and foot pedals now!
And a cool screen!
Jim got more scaffolding moved into the back of the shed, and a few more tubs put up on the shelves...
Jim needed to make a flat workbench to work on the siding, so he brought up some plywood...
First step was to finish the Z-flashing on the bottom, so Jim cut a piece to size...
He first staples it in place...
Then nails it...
We got another piece up...
Pre-drilling the next piece after we marked it...
Jim had to use his shears to cut the end flange off and then we got the last piece up...
So then it was time to start on the other side with J-channel flashing at the top...
Using his jig to mark location for the bottom Z-flashing...
Forming the end...
Then putting it in place...
Pre-drilling the first piece of siding for this side...
There are never pictures of the siding actually going up, because while Jim holds the bottom up, I'm up on the scaffolding getting the siding to fit behind the J-channel. Teamwork! First piece up...
Pre-drilling next piece...
Second piece up - we have a good start to this side now!
No comments:
Post a Comment