Yesterday was kind of a strange day. Jim had to get blood work done in the morning and we had Holy Day services in the afternoon. In between, we got some things done around here and visited Mom.
Today, Jim's first task was to meld the drip edge connections at the ridge on both the front and back sides. They turned out nice...
Then it was back to shingles...
Doing some distressing...
Working on the top row - hard to get good pictures on this side because of the trees and the slope.
All done!
The birds-eye view!
Jim still has to do the ridge vent and shingles, but those shingles haven't come in yet. He went up in the pole barn attic to see what kind of vent material he had left...
Since the roof is done for the moment, we unpacked another bundle of siding parts, including the fascia boards which will be his next job.
Jim wanted to get the drip edge on the overhang done, so doing some measurements...
Working on the side piece...
This was a challenge to get the sides to mate well with the front, but he's happy with the way it turned out...