Saturday, July 30, 2022

7.30.2022

Doing the detail work to finish off the air conditioning system, putting the channel cover on.  Amazing to think Jim was able to get all the plumbing, electric and condensation lines in this one channel!


Time to take the scaffolding down...


Then Jim was able to cut the grass back here - everything looks so good!


Switching gears back to the lean to.  Jim had picked up more wood the other evening at Home Depot so he made the rest of the blocking and got that installed...


Attaching the sheathing...


Putting on the underlayment...


End-of-the-day picture - roofing is all done except the shingles!


Time to get ready for church!  

High 78.1/Low 60.7 - gorgeous!


No comments:

Post a Comment