This morning, Jim got the wiring done inside the breaker box and then worked on assembling the required outdoor shutoff box for the air conditioner...
Getting the box mounted on the siding - not an easy task at this point. Jim pre-drills and then caulks to prevent leakages.
Jim got the flexible conduit attached - it needs wired up and then the electric work will be done!
Outside, Jim got a bracket modified so that the end rafter could connect with all the existing structural elements...