Friday, July 15, 2022

7.15.2022

 This morning, Jim got the wiring done inside the breaker box and then worked on assembling the required outdoor shutoff box for the air conditioner...


Getting the box mounted on the siding - not an easy task at this point.  Jim pre-drills and then caulks to prevent leakages.  


Mounted and wired up!


Jim got the flexible conduit attached - it needs wired up and then the electric work will be done!


Outside, Jim got a bracket modified so that the end rafter could connect with all the existing structural elements...


Next, he made and installed the last ceiling joist on this back side...


Starting to figure out all the cuts and angles for the front roof rafter...


Rafter is in place!



High 82/Low 54.8 - beautiful!