 Jim spent almost all day in the auto bay doing the skim coating.  This side is all done but the tricky corner...


Working around the walls...


Doing the high bay wall area...


Continuing around...


Jim had to dismantle the garage door rail mount from this area...


This area is all done...


Tricky working in this corner by the air compressor - he had to do some from the scaffolding and some from the ladder...


But the skim coating is all done in this bay!


After doing some clean up, Jim headed outside for just a bit to do anything else but plastering!  He broke up some of the old concrete again...


Then did some handpicking of rocks for the wall - once he filled up the bucket, he placed them on the wall.


High 72/Low 49


Wednesday, September 23, 2020

9.23.2020

Jim started the skim coat process in the auto bay today.  He first experimented with troweling it on and off, but he decided he didn't like that plan.


So he decided to use the roller to put the plaster on...


...then trowel the plaster off.  This is such a very thin layer but it requires a perfect touch to make it come out right! 


Working down the wall...


Stopping point for the day - always have to factor clean up time too!


Jim got the other side form off and dragged it out of the way.  If we do another section, he's hoping to be able to reuse this form...


Cleaning up the edges...


Just a quick measure to see how far it would be until the driveway fork...


It really looks good!


High 72/Low 46


Tuesday, September 22, 2020

9.22.2020



Hard to believe it's Fall, although our weather has definitely felt that way.  We've started to see some colors in the trees too, which is always nice.

Jim and I started the day by going out and walking on our new concrete!  It really turned out perfectly.

Then Jim spent the morning doing plastering in the metal shop...


In the afternoon, he headed outside to start taking forms off the concrete...


This curved piece sure was a challenge for Jim to make and he worked a bit about its strength during the pour, but it worked like a charm!  


The curves on the driveway are my favorite part - look how nice this looks!


Cleaning up the edges...


Jim cleaned off the cement mess from the plywood...


Then we got them restacked in the pole barn to use again...


We did some measuring and marked the first cuts on the concrete.  These cuts are important because this corner area would be one of the first places to crack.


Sadly, the missing parts for the cart haven't come in yet so Jim has to do this by hand.  First, he does the scoring with the wood as a guide (I'm standing on the other end!)


Once the scoring is done, he hooks up the water and makes the deeper cuts...


All done with cutting for today...


Spraying off the concrete...


It's kind of in shade but you can see that the water flowed just like Jim planned for with the slopes - everything rolls off the side...


All cleaned up for now...


Jim needed to get more plaster and some receptacles, so he headed to Home Depot at the end of the day.

High 66/Low 43


Monday, September 21, 2020

9.21.2020

Concrete day came bright and early - and a bit chilly too!  It was just barely above freezing when we headed outside.  The crew has coffee in hand and are ready to go! 


Here comes the truck!


We got our good driver this time so he is wonderful about placing the concrete...


In the thick of it...


This driver just pitches in - quite a difference from the other guy who never got out of his truck!  Jim brings out the power screed...


Bull floating...


Working down the last of this section of the driveway...


Then starting on the area next to the pole barn...


Using the power screed in this area.  This was a tough area because Jim wanted the slope different than the rest of the driveway so it all needed to blend in seamlessly.


Using the bull float on this area...


Then working the concrete back in the main driveway area...


Using the power screed...


Once they were past the curve, then it was just straight down the driveway until the concrete was gone...


I had to hold the cable for the vibrator so I didn't get any pictures, but Kyle again had that job, making sure the concrete was vibrated to the bottom of the slab for good edges.

Using the bull float...


Putting up the final form at the end...


Jim had to shovel the excess concrete away from the back form so that he would be able to get the form off tomorrow...


One last power screed...


Wow - all placed!  They're just working on edges...


Time to broom the finish...


Another length of handle on the broom so that it will span this area...


Continuing down the driveway...


Wow - it turned out so beautifully!


Starting to do clean up...


Time for celebratory cinnamon rolls before we had to say goodbye to Kyle as he headed back to NYC.  Thanks so much, Kyle!


Jim had to use the Bobcat to break up the leftover concrete a few times throughout the afternoon...


A coat of curing agent/sealer...


After lunch and getting everything cleaned up, Jim turned his attention to more plastering in the metal shop...


Another layer on the ceiling in the auto bay...


Somehow he even had energy to get on the treadmill at the end of the day before coming upstairs and calling it a day.  Another very successful day!