Tuesday, February 6, 2024

2.6.2024

Another piece of baseboard backing board up...


That was the last piece of plywood he had, which is why he picked up another piece at Lowe's the other day.  Today, he cut it cut to size...


Started making some door frame moldings...


Putting the wood through the molder...


He had to come up with a smaller design on this inside door edge - this one is perfect!


The next room he is going to do baseboards in is the laundry room - he glued end blocks next to both sides of the vent...


Time to do some priming of the door frame pieces...


And all the plywood backing pieces...


More pieces drying...


High 36.9/Low 19.6


No comments:

Post a Comment