Thursday, September 15, 2022

9.15.2022

 We got our gravel deliver today, so Jim directed him to back up our new driveway...


And then start dumping...


Okay - we now have lots of gravel to spread!


Jim set up the laser level and marked a line around the perimeter off the lean to, then figured out where he wants the top of the concrete to eventually go...


Measuring from his mark...


Then we struck a chalk line all around the bottom...


Jim went up and got the first scoop of our new gravel...


And brought it down to the lean to...


Lots of hand shoveling followed...


Using the come along to spread it...


Done!


Jim put more gravel where it had settled before the start of the concrete drive...


Now that the pole barn is ready for inspection, we wanted to finish doing the rock retaining wall, so Jim brought multiple loads of stones up...


And we got busy placing them in the back and around the front...


Looks amazing from below...


And from this angle...


High 67.5/Low 49.1 - gorgeous!


No comments:

Post a Comment