 Jim started cutting the back pieces for the cabinets...


Painting the other side of shelves...


Shelf pieces drying...


Painting side pieces...


Lots of drying stations happening in the shop!


Then it was back to drywall - measuring for all the cut outs for the top row...


The top row is all done around all these utilities!


Working on the other side...


This row is attached and light fixture cut out...


Using the rotozip to cut out the door opening...


All done - sure looks like a room now!


Jim put more grips on the bottom of our shower stall just for added safety...


High 56/Low 50 - light rain all day