Jim did more computer work this morning; he's busy starting to design the steel structure for the banquette seating!
In the shop, he did some sanding of the pole barn door panel...
High 27.2/Low 15.2 |
Jim did more computer work this morning; he's busy starting to design the steel structure for the banquette seating!
In the shop, he did some sanding of the pole barn door panel...
High 27.2/Low 15.2 |
Jim had computer work this morning, including responding to an Amazon email wondering why we returned 3 treadmills!
In the shop, he got the panel cut for the pole barn man door...
Jim did the milling for the dado cuts on the door pieces...
This morning, Jim worked on installing all of the drawers in the bathroom cabinet - they look amazing! He's waiting for another bearing to come in so that he can fix his trim router; then he'll trim the Formica so he can install the drawer bottoms...
Jim was busy this morning prepping wood for more pole barn lean-to door pieces - planing...
Jim went out this morning before the next round of snow started to get more diesel fuel. The forecast is for an additional 3-6" so he'll need some fuel for the Bobcat. He also picked up some deliveries in the new box, including his new bearings and a spanner wrench to fix his trim router...
Mom and I had to leave early this morning for a doctor's appointment, then errands afterwards. Jim had the driveway in fabulous shape - we had no issues going down or coming back home. And NY does such an amazing job on their roads - the day after a 10" snow, you won't see a drop of snow on the roads, even back ones!
While we were gone, Jim worked in the shop - he's starting to turn his attention to making the pieces for the pole barn door. Here are the beginnings of the stiles...
High 31.8/Low 26.4 |