Friday, August 5, 2022

8.5.2022

It was a day with a few pop up showers in between those bright blue skies, so Jim planned an inside day today.  One of the last pieces on the air conditioning system is the condensation drainage line.  Right now, he has the lines from both units into a Y connection and dripping into a bucket on the floor (you can see it hanging on the left side of the picture).  Today, he made special blocking and attached brackets so that he could run the lines close to the ceiling...


A better picture of the blocking and brackets holding up the line...


Working on the back wall is not easy because of all the wood in the way.  Plus, all the lines have to be at the right degree of slope so that the water will run downhill until it goes outside.


He's rounded the corner and the line is over to where he needs to make a connection to the pipe leading outside.  He needs another piece of pipe - that may be an agenda item for the morning.


High 85.3/Low 69


No comments: